| Representative Commissions |
|
Process Industry
Burrup Fertilizer Safety Case Review (258-03 to 06)
Various aspects of the safety case review for Burrup Fertilizers on behalf of DOCEP.
Comet Blackwater (326-05)
Development of availability models to review projected availability figures for the proposed plant design.
Heat Flux Consequence Modelling (417-01)
Heat flux consequence modelling was completed to check the fire design concept to ensure adequate separation distances with regard to fires involving large quantities of solvent and credible worst case wind conditions.
Due Diligence of the Dairy Industry Review (416-01)
A review of the issues management process of Dairy Australia and the Technical Issues Group was undertaken from a due diligence perspective.
Fire and Explosion Due Diligence Review (298-12)
A review of the fire control system from ship to silo was completed to test if Safety Integrity Level (SIL) ratings ought to be provided for the proposed fire control and explosion suppression systems upgrade.
Fire Risk Due Diligence Review (411-01)
An expert due diligence review was completed at an oil blending plant with regard to fire protection.
Kansanshi Heat Flux Calculations (354-01)
Exposure fire consequence calculations for a line source in process solvent.
Mt Arthur North Coal (326-04)
This review involved 3 high level critical success tasks:
- A strategic review of project critical success factors & external threats
- A zonal review identifying critical common mode failures
- A high level availability review
Nitrogen Storage and Handling Due Diligence Review
Various due diligence reviews regarding sensible practical precautions for safety concerns associated with liquid nitrogen in laboratory facilities.
Olympic Dam Fire Investigaions (184-02 & 03)
Investigation, analysis and recommendations regarding a blower explosion and CS-X fires.
Physical Asset Evaluation Tool (PAET) (326-01)
Originally developed for the Maintenance Network for BHP Billiton, the PAET was used to test the following:
- That the plant could achieve the stated performance targets with an acceptable maintenance effort;
- Ensure there is no overarching risk issues, and results are presented in a manner appropriate to relevant decision makers.
Safety Criticality Review (418-01)
A safety criticality review was completed focussing on manual tasks that had the potential to result in fatality or serious injury to ensure that all sensible practicable precautions are in place.
Sugar Silo Due Diligence Review (298-11)
A due diligence review of the process used to clean the residual sugar from a Port facility silo was completed. This was with particular regard to the operation of the remotely controlled front end loader giving rise to potential explosion hazards. |